Preview: check roof-data availability by address. Sample reports use synthetic data.Payments are in test mode.Read the sample report

Skip to main content

Roofing resources

How to Read a Measurement Report & Facet Ledger

Start with the report identity, the area basis and the evidence. Then follow the measurements into the details.

RoofKarma resource library · Updated

Míralo antes de empezar.

Una guía breve para leer el informe y saber qué preguntar después.

Cómo leer un informe de techo

Empieza por el plano, revisa el área y la pendiente, y consulta las fuentes y las limitaciones antes de hablar del trabajo.

Ver video y transcripción

Cómo leer un informe de techo

Lee primero el plano para ubicar las caras y las líneas del techo. Revisa el área y la pendiente juntas, y después las fuentes, la calificación y las limitaciones. Un techador debe confirmar las condiciones antes de iniciar el trabajo.

Explorar muestras sintéticas

Confirm the property and report version

Check that the building, report identity and version match the work you are planning. Synthetic samples are labeled and never describe a real customer property.

Read the units and area basis

A roofing square is 100 square feet of roof surface. Apply a pitch adjustment only when converting horizontal projected area to sloped surface area.

Follow the facet ledger

Each planar roof section has its own identity, area and pitch where supported. Match ledger labels to the plan and, for mixed pitches, calculate each facet separately.

How do edge lengths become material quantities?

Eaves, rakes, ridges, hips and valleys have different roles. Use their classified lengths with the selected material system, installation details and separately identified accessories.

Synthetic example: 120 linear ft of an applicable edge divided by a hypothetical 10 linear ft of usable coverage per piece is 12 pieces before project-specific cuts. Use the actual product’s usable coverage after required laps, then round up to whole purchase units; never assume nominal piece length equals installed coverage.

From classified edge lengths to a material review
Report quantityMaterial planning useCheck before purchase
Facet area (sq ft)Field shingles and underlaymentSurface basis, waste scenario and product coverage
Eave / rake (linear ft)Starter and edge metalApplicable edges, laps and installation instructions
Hip / ridge (linear ft)Cap shingles and eligible ridge ventsSeparate cap coverage; ventilation design
Valley (linear ft)Valley lining or flashingOpen or closed valley system and lap requirements
Wall junction (linear ft)Step or headwall flashingWall detail, pieces, exposure and overlaps

Check sources before using the result

Review capture dates, confidence reasons, missing evidence and exclusions. An illustrative material list is a planning example; supplier ordering requires reviewed products, quantities and SKU mappings.

YOUR ROOF. YOUR NEXT STEP.

Start with a clearer picture.

Check your property